Site selection or lease review
Validate carrier serviceability, building access, risers, equipment-room conditions and unusual infrastructure constraints.
Review the site requirements
Office move and facility technology guide
Technology delays are usually created before equipment arrives.
CompFlorida coordinates carrier lead times, pathways, equipment rooms, cabling, networks, security, AV and cutover dependencies with the occupancy schedule.

Start at the current decision point
The earlier technology enters the project, the more options remain. Later engagement requires faster dependency validation and explicit contingency planning.
Validate carrier serviceability, building access, risers, equipment-room conditions and unusual infrastructure constraints.
Review the site requirementsDefine technology rooms, pathways, power, ceilings, coverage, device locations and system interfaces.
Coordinate the technology designReconcile drawings, field conditions, submittals, lead times, access and change responsibility.
Resolve construction dependenciesPrioritize critical-path items, temporary services, overlap, acceptance tests and rollback decisions.
Protect the move dateControl outages, access, dust/noise restrictions, temporary operations and staged cutovers.
Plan the occupied workStandardize repeatable requirements while managing building and provider exceptions.
Standardize the rolloutCritical path
A usable facility requires multiple workstreams to converge in the correct sequence.
Coordinated workstreams
Each workstream needs requirements, an accountable party, predecessors, a due date and acceptance evidence.
| Workstream | Key decisions | Typical schedule risk |
|---|---|---|
| Connectivity | Carrier, bandwidth, diversity, demarcation and temporary service | Construction and building-access lead time |
| Network | Firewall, switching, Wi-Fi, addressing and standards | Equipment or configuration arrives before requirements |
| Physical layer | Copper/fiber cabling, pathways, racks and labeling | Ceilings close before field validation |
| Facility systems | Voice, AV, cameras, access control and integrations | Interfaces and ownership remain undefined |
| Power and rooms | Circuits, UPS, PDU, cooling, clearances and security | Technology assumptions conflict with facility design |
| Operations | Support, documentation, training and escalation | Installation completes without an operating owner |
Continuity planning
Specific uptime commitments depend on architecture, provider delivery and scope. The plan should make critical dependencies and fallback decisions explicit.
Determine when old and new services must operate simultaneously.
Assess realistic interim options before the primary circuit becomes critical.
Define change windows, responsible parties, testing and communication.
Name who decides whether to continue, pause or restore the prior state.
Prepare onsite and remote resources for exceptions after occupancy.
Transfer diagrams, contacts, credentials process, warranties and open issues.
Project control
As early as practical—ideally before lease and construction decisions remove options. Carrier and pathway constraints can affect the schedule months before cutover.
Yes. CompFlorida can lead or supplement the technology workstream while internal IT and incumbent providers retain their defined authority.
Field conditions and new requirements are documented with schedule, cost and dependency impact before approval.
Agreed acceptance tests, resolved deficiencies, operational documentation and named support ownership—not installation completion alone.
Protect the opening date
CompFlorida will identify critical technology dependencies, missing ownership and the appropriate planning or coordination scope.